Email Us
info@joe-yan.net
Call Us
0161 654 6677
Customer required urgent design and installation. All this project was designed, installed and commissioned within 3 weeks.
See What We Did HereFabrication of a stainless steel platform for a Blue Chip Company.
See What We Did HereThis is some of the work we did for a bakery.
See What We Did HereSome of the work we did for a Bakery includes Storage Bins, a Dough Hook and a Conveyor.
See What We Did HereWorkshop Capacities SOLIDWORKS Design Software Guilotine 3mtr x 8mm ST Steel Folding CNC 3mtr x 8mm ST Steel Section Rolling 200 x 90 PFC 120 x 120 RHS 100 x 100 RSA 80 x 50 T.Section 100 Dia Tube and Smaller TIG Welding, MIF Welding Mild Steel, Stainless Steel, Aluminium MMA Mild Steel, Stainless Steel, Aluminium Punching 3...
See What We Did Here